The problem
Planned times exist, actual times are guesswork. Post-calculation runs on estimates, and the supervisor learns about a disruption by chance.
- 02
How POM solves it
At the terminal, employees scan order and personnel number, and if needed operation, workstation, tool and batch. Before the start POM checks whether anything speaks against it and says so in plain language. Stop books the quantity, scrap with a mandatory reason, or a disruption – which lands as a task with the person responsible.
- 03
The result
Actual hours, quantities and costs per order – the raw material for honest post-calculation.
Functions
What is inside.
-
Scan, start, stop: order and personnel number, optionally operation, workstation, tool and batch
-
Stop with finished quantity, progress, break or wrong booking; scrap and rework with a mandatory reason, downtime reasons from a catalogue
-
Checks before the start in plain language: blocked, qualification, absence, calibration, batch requirement
-
A disruption or missing quantity becomes a task for the person responsible, due by end of shift
-
If the network fails, the terminal keeps booking and sends later; duplicates are recognised
-
Downtime alert; evaluations by workstation, tool, order and shift
-
Order analysis target versus actual, marked as preliminary
-
Label printing at the terminal; the batch scan writes into traceability
- Roadmap
From December 2026: scrap log: scrap with reason and quantity, analysed in POM Quality
- Roadmap
No date yet: OEE in shop floor data, loss cascade and plan-versus-actual Gantt
How it fits together
Every module feeds the next.
Receives
- POM Core Production orders to log on and off at the terminal, “next orders” for the operator
Passes on
- POM Core Times and good quantities move the order’s progress on; completion books the receipt
- POM Costing Actual times for post-calculation, plan versus actual; from five confirmations a target-time proposal
- POM Machines & Maintenance A reported fault becomes a task with the machine history and a lock proposal
- POM MES Cable Assembly MES Cable Assembly builds on shop floor data expected January 2027
- POM Quality Scrap with its reason from shop floor data goes into the scrap log and is analysed in Quality from December 2026
- POM Time Recording Contradictions between attendance and shop floor bookings as a list to clear up
- POM Analytics Feedback from production
Price
Concurrent users count, not accounts.
Module, booked individually 10 % saving with annual billing
| POM Shop Floor Data | with 1user | with 5users | with 10users | with 20users | with 50users | more than 100users |
|---|---|---|---|---|---|---|
| net / month | +39 € | +179.40 € | +335.40 € | +608.40 € | +1,310.40 € | On request |
| net / month, annual billing | +35.10 € | +161.46 € | +301.86 € | +547.56 € | +1,179.36 € |
Example amounts with the same number of users, net plus statutory VAT. Per module you book as many concurrent users as you need, at most as many as in the core. User accounts are unlimited.
Each shop floor terminal counts as 1 user (core + data capture); workers book there with their badge, without a licence of their own.
Each shop floor terminal counts as 1 user (core + shop floor data); workers book there with their badge and need no licence of their own.
More than 100 concurrent users: individual quotation, price on request. Request a quote
Quick answers
Questions about POM Shop Floor Data
What is shop floor data capture?
Times and quantities are captured where the work happens instead of being estimated later. At the POM Shop Floor Data terminal, employees scan order and personnel number, and if needed operation, workstation, tool and batch, and start and stop their work. Scrap and rework require a reason.
What happens if the network fails?
The terminal keeps booking and sends the data once the connection is back. POM recognises duplicate transmissions. A disruption or missing quantity becomes a task for the person responsible, due by end of shift.
How is a shop floor terminal licensed?
Each shop floor terminal counts as one concurrent user in the core and in POM Shop Floor Data. Workers book there with their badge and need no licence of their own. User accounts are unlimited.
Does POM Shop Floor Data calculate OEE?
No, not today. Shop floor data provides evaluations by workstation, tool, order and shift, a downtime alert and the order analysis target versus actual. OEE per machine is part of POM MES Cable Assembly, which is in development (expected January 2027).
Production
More modules in this group.
- Module
POM Machines & Maintenance
Machines, tools, gauges and fixtures in one register – with maintenance, calibration, due dates and locks.
+59 € / month net with 1 user Learn more - Module
POM Subcontracting
From December 2026: outsource operations to suppliers – external work with provided material, return delivery, inspection and material balance.
+29 € / month net with 1 user Learn more
POM in your industry
Where POM Shop Floor Data matters most.
-
Cable assembly
The industry POM was born in: hundreds of components, customer-specific variants, proof on every crimp.
Learn more -
Machine building
Single units and small series, long procurement, many trades on one order.
Learn more -
Electrical engineering
High variant counts, test duties and a mix of series and specials.
Learn more -
Contract manufacturing
Changing customers, changing parts – margins decided in the quote and defended on the floor.
Learn more
See POM for your business.
First we show you POM in an online demo with a sample company. After that you can test it for 30 days with a trial licence of your own.