DE EN
Request a demo

POM in your industry

Software for cable assembly

The industry POM was born in: hundreds of components, customer-specific variants, proof on every crimp.

Online demo first, then a 30-day trial

The challenges

What it really hinges on here.

  1. 01

    One harness unites wires, connectors, seals, conduits and labels – each with its own lead time

  2. 02

    Variants per customer and drawing revision instead of one stable series

  3. 03

    Crimp quality has to be provable, per order and per person

Born in cable assembly

Why POM knows cable assembly.

POM was created at Powertune Spezialkabelsysteme GmbH & Co. KG – a cable assembly company with more than 150 employees. A harness there consists of wires, terminals, seals, conduits and labels; every item has its own lead time, every customer their own variants and drawing revisions.

Today POM carries cable assembly from quote to invoice: bills of materials with unchangeable revisions, the planning board with staff suggestions by qualification, feedback at the terminal with POM Shop Floor Data, inspection plans with POM Quality, and batches and serial numbers with POM Traceability. POM Piecework Pay settles piecework and homework from the same employee master.

In many companies, the knowledge of how a terminal is crimped onto a wire lives in heads and binders. That is what POM MES Cable Assembly is being built for: catalogues for wires, terminals, seals, tools and crimp standards, machines with capabilities and a control station with set-up-optimised sequencing. It is in development and expected in January 2027; customer pilots start from the first quarter of 2027.

One harness, one system

How an order runs through POM.

  1. 01

    Enquiry and quote

    The enquiry gets an owner and a deadline, costing provides the price with its derivation, and the quote is created from it.

    POM Sales & CRMPOM Costing

  2. 02

    Order and material

    The order confirmation checks bill of materials, routing and material date and creates the production orders. Missing material blocks the order until it arrives.

    POM Warenwirtschaft (ERP)POM Core

  3. 03

    Planning

    On the planning board you distribute the operations across employees; staff suggestions take qualification into account.

    POM Planning

  4. 04

    Production and proof

    At the terminal, work is started, stopped and quantities are reported; the batch scan writes into traceability. Inspection plans record measured values that cannot be changed.

    POM Shop Floor DataPOM QualityPOM Traceability

  5. 05

    Pay, shipping and invoice

    Piecework and homework flow into the monthly list, shipping prints the label, and the invoice goes out as a checked XRechnung.

    POM Piecework PayPOM ShippingPOM Warenwirtschaft (ERP)

What POM brings to your industry

POM was not adapted to cable assembly – it was born there. Qualifications, inspection plans, batches and piecework are built in. The MES for cable assembly is in development and expected in January 2027.

Quick answers

Questions from practice.

Which software suits a cable assembly company?

One that keeps harnesses made of wires, terminals and seals, customer-specific variants and proof per order in a single system. POM was born in a cable assembly company and connects inventory, planning, shop floor data capture, quality and piecework pay on one database.

Is there an MES for cable assembly?

POM MES Cable Assembly is in development and expected in January 2027; customer pilots start from the first quarter of 2027. Until then you capture times and quantities with POM Shop Floor Data.

Can POM settle piecework in cable assembly?

Yes. POM Piecework Pay keeps piece rates with validity and quantity scales, monthly lists per employee and the assignment of homework per work step and partial quantity. Employees come from the shared master data – nobody is entered twice.

Can results from the cable tester be imported?

Yes. POM Quality imports test device files in CSV format instead of someone retyping values. The inspection report is available as print or CSV.

Can existing master data be imported?

You import master data and bills of materials from Excel or CSV, with a trial run. Open quotes, order confirmations and purchase orders can be taken over at a cut-off date; a second run creates no duplicates.

Built in manufacturing. Built for manufacturing.

First we show you POM in an online demo with a sample company. After that you can test it for 30 days with a trial licence of your own.