30-day trial after the demo. First we show POM online.
POM – Production Operations Management
One system instead of ten
Ten programs. Or one system.
In many manufacturing companies every department runs its own program: ERP, planning, shop floor data, CRM, quality, time recording, accounting, with interfaces, exports and spreadsheets in between. POM brings it all together: one database, one sign-in, no interfaces between departments.
Today: many programs
ERP
Planning
Shop floor data
CRM
Costing
Quality (CAQ)
Time recording
Accounting
Warehouse
Shipping
Reporting
Notes and e-mails
Interface
Export and import
Re-typing, notes, e-mail
Every program has its own state, its own master data and its own sign-in. What belongs together is linked by interfaces, exports or somebody types it in again.
Every department works on the same database. An order, an article, an employee exists exactly once, each department sees it from its own angle.
With many separate programsWith POM
×One order lives in several programs, each with its own state.One order, one process number, one state. Follow-up documents take over what has already been entered.
×Employees maintained separately in time recording, planning, shop floor data and the pay list.One employee record: time recording, absence, skills, piecework pay, shop floor data and planning all read the same person.
×Interfaces and exports that can break whenever one of the programs is updated.No interfaces between your own departments, every module works on the same database.
×Every program calculates its own key figures and none of them match.Every key figure is calculated once on the server; screen, cockpit and export read the same calculation.
×Many sign-ins, many permission systems, many contacts.One sign-in and one permission system: the server checks permission, module and company on every access.
×Invoices are exported or re-typed for accounting.Sales and purchasing documents are posted automatically in POM accounting.
What POM covers
Typical separate programs in a manufacturing company and where the same job lives in POM. Anything not yet available is shown with its status.
Your company sets the rules, order types, workflows, duties and deadlines. POM guides within these rules: it shows everyone what is due, passes work to the right person and makes suggestions. Your people decide.
POM – Production Operations Management
Today: your own tasks with deadline and direct entry, switchable between “Me” and “Team”. Sample data.
1What is waiting for me?My work · with deadline
2What am I waiting for?With purchasing · since yesterday
3Who is waiting for me?Waiting for you · 3 items
Each person’s start page answers: What is waiting for me? What am I waiting for? Who is waiting for me? Messages are sorted by urgency, critical, action needed, information.
Hand-overs become tasks
When a process moves to another department, a task is created with an owner, a deadline and a direct link, from order confirmation to scheduling, for example, or from delivery note to invoicing. The sender sees who has it and since when.
Create invoice Delivery note · process 26-0412
Due tomorrowOpen
Your view as the senderWith accounting · for 2 hrs · due tomorrow
Done only with a result
A task ends in one of four ways: done with a result, acknowledged, deliberately deviated from with a reason, or postponed to a date. Anything that requires a result cannot be clicked away.
Done with a result
Acknowledged
Deviated, with a reason
Postponed, to a date
An owner, not “everyone with access”
Tasks go to one person: owner, team, up to three ranks of cover, then the head of the area. Responsibilities belong to functions such as purchasing, not to names, per task area and site.
1Owner
2Team
3Cover, ranks 1–3
4Lead owner of the area
5Named head
Automatic cover with simulation
POM checks working time, approved absence and time bookings and covers within the team first, then via the approved chain. Before switching it on, a simulation shows who takes over. Cover never transfers permissions by itself.
Simulation before switching on
AawayBawayCtakes over
If A and B are away, C takes over.
Suggestions from your own data
Learning lead times, new target times from post-calculation after five confirmations, supplier comparison with the real unit price, staff suggestions by skills and workload. Calculated without AI and without internet, adopted only after confirmation.
No AI · no internet
Adjust lead time?Stable deviation detected at the supplier
AdoptDismiss
Adopt new target time?Median of at least five confirmations
AdoptDismiss
Supplier comparisonReal unit price incl. minimum quantity and pack size
The next step is visible
Quotation, order confirmation, delivery note and invoice share one process number; for each process POM shows what is done and what comes next. POM does not create follow-up documents itself but as a prefilled task, so nothing is created twice.
QuoteOrderDeliveryInvoice
Create invoice
Fits the size of your company
On your own, a small team or departments: the process stays the same. Whoever has the permission and the responsibility simply carries on. The operating mode can be switched with a preview.
On my ownSmall teamDepartments
Recreated view, sample data
POM – Production Operations Management
Responsibilities and cover per task area, a responsibility grants no permission. Sample data.
In POM a module is not a separate program but a view onto the same data. Pick a module: the map shows what it receives from others and what it passes on.
Business
Logistics
Production
Connect
Quality
Company
Analyse
People
Core
POM Core
In every licence
Orders and production orders, master data, Today, tasks, messages, calendar, forms, workflows, hazardous substances register and administration. With planning: planning board, capacity and staff suggestions. From December 2026 with an inbox that recognises e-mails and assigns them to the right case.
Receives
Warenwirtschaft (ERP) The order confirmation creates a production order per line and hands “schedule” to work preparation; purchase dates show the material risk
Shop Floor Data Times and good quantities move the order’s progress on; completion books the receipt
Machines & Maintenance Maintenance and over-allocation as a notice in planning
Warehouse Logistics Staging for production per shift from the same stock ledger
Quality An open quality block stops the completion
Time Recording Approved absence immediately affects capacity, planning board and staff suggestions; clocking in and out tells the automatic cover who is present
HR On the effective date POM switches badge, cover and planning; after an approved leaving date nothing is planned beyond the last working day from December 2026
Integration Writes orders, customers, articles and employees from other systems; feedback goes back
AI Interface (MCP) External AI programs read, draft and propose, never with more rights than the person; a person approves
Multi-Site Stock and ledgers per site; one order can run across two plants
Passes on
Warenwirtschaft (ERP) Demand from production orders becomes a purchase proposal
Warenwirtschaft (ERP) The inbox recognises an order e-mail and assigns it to customer and quote; after checking and approval it becomes the order confirmation from December 2026
Shop Floor Data Production orders to log on and off at the terminal, “next orders” for the operator
Time Recording One employee record: time recording, absence, skills, piecework pay, shop floor data and planning read the same person
Piecework Pay The same employee record, no second staff list for piecework
HR The same employee record, HR does not create a second personnel register from December 2026
Analytics Orders, dates and lead times
What the module does
“Today”: what is due for me? What am I waiting for? Who is waiting for me? – with notices by urgency
Hand-overs as tasks with owner, deadline and direct link, for example from order confirmation to scheduling or from delivery note to invoicing
Tasks end with a result: done, acknowledged, deliberately deviated with a reason, or postponed with a date
Chain of responsibility and automatic deputies: team, deputies in up to three ranks, a simulation before switching on, every activation logged
Sales from quotation to credit note with product configurator and price maintenance, purchasing with order proposals and invoice matching, basic warehouse and stocktaking. From December 2026 an order received by e-mail becomes an order confirmation after checking and approval.
Receives
Sales & CRM Once the quote is accepted, the task “create order confirmation” is created; the owner travels with it
Costing Approved costing as the price source in the quote, prices taken over into price lists
Core Demand from production orders becomes a purchase proposal
Shops & Marketplaces Orders from shops and marketplaces are checked and turned into an order confirmation
Core The inbox recognises an order e-mail and assigns it to customer and quote; after checking and approval it becomes the order confirmation from December 2026
Subcontracting An external operation on the production order becomes an outsourcing order with provided material and return delivery from December 2026
Complaints Replacement delivery and credit note linked to delivery note and invoice
Integration EDI call-offs come in through Integration and are taken over in Warenwirtschaft from December 2026
Passes on
Core The order confirmation creates a production order per line and hands “schedule” to work preparation; purchase dates show the material risk
Costing Landed costs from supplier invoices flow into costing and margin
Shipping The delivery note becomes a shipment: lines, label, tracking, shipping e-mail
Warehouse Logistics The same articles, stock, batches and reservations, no second warehouse system
Quality Goods receipt requiring inspection: blocked stock and the task “inspect”; the release notifies the waiting order
Accounting Invoices and supplier invoices post themselves when finalised; open items and payment runs
Analytics Documents, stock and deliveries
What the module does
Fixed document sequence from quote to credit note, one process number across all documents
The order confirmation checks bill of materials, routing and material date and creates the production orders
Collective invoice from delivery notes; finalised invoices cannot be changed, corrections are made with a counter-document
Down payment, progress and final invoices; pricing with “Why this price?”; blanket orders with call-off schedule
Costing schemes, formulas, cost rates, quantity scales, scenarios and post-calculation, every price with its derivation. Plus the margin per article and customer and the answer to “Why does this article cost so much?”.
Receives
Sales & CRM Request a costing straight from the enquiry, as a task with a deadline
Warenwirtschaft (ERP) Landed costs from supplier invoices flow into costing and margin
Shop Floor Data Actual times for post-calculation, plan versus actual; from five confirmations a target-time proposal
Passes on
Warenwirtschaft (ERP) Approved costing as the price source in the quote, prices taken over into price lists
What the module does
Costing schemes with lines, variables and formulas (surcharge, machine hour rate, contribution margin); factory templates
Every figure with its derivation, “Why this price?” in the sales document
Cost rates for employee, machine and cell
Operations with separate machine and labour times, set-up time spread over the lot size
Built-in financial accounting: chart of accounts, journal, open items, payments, dunning, cash book, closing and DATEV.
Receives
Customs & Foreign Trade Exit confirmation as proof of the tax-exempt export
Complaints Disputed items in accounting
Warenwirtschaft (ERP) Invoices and supplier invoices post themselves when finalised; open items and payment runs
Passes on
Sales & CRM Open items and credit limit in the sales view of the customer
Analytics Open items
What the module does
Double-entry bookkeeping with chart of accounts templates SKR03 and SKR04 plus templates for Austria and Switzerland; postings are only reversed, never changed
Automatic posting when invoices are finalised, with configurable account determination
Open items, cash discount, write-offs with four eyes, balance confirmation; dunning with proposal, approval and e-mail
Bank statement import (camt.052/.053/.054, MT940, CSV), payment proposal, payment run, SEPA direct debit
Plans the machines: machines, tools and gauges with maintenance and calibration history, due dates and locks. From December 2026: machine per operation, workload and weekly plan per machine.
Receives
Shop Floor Data A reported fault becomes a task with the machine history and a lock proposal
Passes on
Core Maintenance and over-allocation as a notice in planning
Quality Only calibrated gauges: an expired gauge is flagged as soon as work starts at the terminal
MES Cable Assembly Machines and their plan come from POM Machines & Maintenance, the MES records execution expected January 2027
What the module does
One register for workstations, machines, lines, tools, gauges, fixtures and vehicles
Maintenance and calibration history; the next date is calculated from the history, calibration entries cannot be changed
Calibration requirement per equipment type: notice or refuse the booking
Locks with a reason, release with history; due list with notices in planning, at the terminal and in “Today”
From December 2026: outsource operations to suppliers, external work with provided material, return delivery and incoming inspection.
Receives
No direct connection
Passes on
Warenwirtschaft (ERP) An external operation on the production order becomes an outsourcing order with provided material and return delivery from December 2026
Quality Incoming inspection of the return delivery from December 2026
First module of the MES family: records execution in cable assembly, production plans, control station with set-up optimisation, machine client and OEE. Price per MES user, such as the control station or a machine PC.
Receives
Shop Floor Data MES Cable Assembly builds on shop floor data expected January 2027
Machines & Maintenance Machines and their plan come from POM Machines & Maintenance, the MES records execution expected January 2027
Inspection plans with characteristics and limits, tamper-proof measured values, quality blocks, incoming inspection, gauges and quality key figures. From December 2026 also the scrap log with analysis by reason.
Receives
Machines & Maintenance Only calibrated gauges: an expired gauge is flagged as soon as work starts at the terminal
Shop Floor Data Scrap with its reason from shop floor data goes into the scrap log and is analysed in Quality from December 2026
Subcontracting Incoming inspection of the return delivery from December 2026
Warenwirtschaft (ERP) Goods receipt requiring inspection: blocked stock and the task “inspect”; the release notifies the waiting order
Passes on
Core An open quality block stops the completion
Shipping Blocked goods only leave the building with a special release
Complaints Complaint straight from the inspection record, linked to inspection and block
Analytics Inspections and blocks
What the module does
Inspection plans with versions and characteristics – dimension, attribute, visual, function, document – with limits and sampling instruction
Assignment per article and process step, at goods receipt too
Inspection records cannot be changed; pass or fail is decided by the server, corrections only as a replacement record with a reason
Quality block with reason, quantity and type of release: fixed, special release or scrap
Clock in and out at the terminal, target versus actual, time accounts, corrections, monthly closing, with holiday calendar and leave requests; from December 2026 also leave entitlement calculation.
Receives
Core One employee record: time recording, absence, skills, piecework pay, shop floor data and planning read the same person
Shop Floor Data Contradictions between attendance and shop floor bookings as a list to clear up
Piecework Pay Piecework earnings go into the payroll hand-over at month end
HR Agreed time off in lieu is entered as an absence once the employee agrees from December 2026
Passes on
Core Approved absence immediately affects capacity, planning board and staff suggestions; clocking in and out tells the automatic cover who is present
HR Time accounts and leave account for staff planning and the calculation on leaving from December 2026
Analytics Times, only as group figures, never per person
What the module does
Clocking in and out with a badge (RFID) at the terminal; buffered if the server fails
At the terminal only one’s own data: day, month, account, remaining leave – requests right there
A forgotten clock-out stays open – POM does not invent time
Working time profiles with core time and break rules, shift models, shift plan, supplements
Guided joining and leaving with tasks for everyone involved, application to hiring, contracts and changes and smart staff planning that makes proposals week by week.
Receives
Core The same employee record, HR does not create a second personnel register from December 2026
Time Recording Time accounts and leave account for staff planning and the calculation on leaving from December 2026
Passes on
Core On the effective date POM switches badge, cover and planning; after an approved leaving date nothing is planned beyond the last working day from December 2026
Time Recording Agreed time off in lieu is entered as an absence once the employee agrees from December 2026
Connects external AI programs inside the company network: read, draft and propose only; a person always approves. Off by default, enabled per company, second factor.
Receives
No direct connection
Passes on
Core External AI programs read, draft and propose, never with more rights than the person; a person approves
What the module does
AI interface (MCP): external AI programs inside the company network – read, draft and propose only
A person in the POM workstation always approves
Off by default; enabled per company, approval per program, sign-in with a second factor
Personnel and employee data are blocked for external AI by default
Shown are connections that are built today. Anything that comes later is marked with its status.
All connections as a list (55)
Passes on
Receives
Sales & CRM
Costing
Request a costing straight from the enquiry, as a task with a deadline
Sales & CRM
Warenwirtschaft (ERP)
Once the quote is accepted, the task “create order confirmation” is created; the owner travels with it
Costing
Warenwirtschaft (ERP)
Approved costing as the price source in the quote, prices taken over into price lists
Warenwirtschaft (ERP)
Core
The order confirmation creates a production order per line and hands “schedule” to work preparation; purchase dates show the material risk
Core
Warenwirtschaft (ERP)
Demand from production orders becomes a purchase proposal
Warenwirtschaft (ERP)
Costing
Landed costs from supplier invoices flow into costing and margin
Shops & Marketplaces
Warenwirtschaft (ERP)
Orders from shops and marketplaces are checked and turned into an order confirmation
Core
Warenwirtschaft (ERP)
The inbox recognises an order e-mail and assigns it to customer and quote; after checking and approval it becomes the order confirmationfrom December 2026
Core
Shop Floor Data
Production orders to log on and off at the terminal, “next orders” for the operator
Shop Floor Data
Core
Times and good quantities move the order’s progress on; completion books the receipt
Shop Floor Data
Costing
Actual times for post-calculation, plan versus actual; from five confirmations a target-time proposal
Shop Floor Data
Machines & Maintenance
A reported fault becomes a task with the machine history and a lock proposal
Machines & Maintenance
Core
Maintenance and over-allocation as a notice in planning
Machines & Maintenance
Quality
Only calibrated gauges: an expired gauge is flagged as soon as work starts at the terminal
Shop Floor Data
MES Cable Assembly
MES Cable Assembly builds on shop floor dataexpected January 2027
Machines & Maintenance
MES Cable Assembly
Machines and their plan come from POM Machines & Maintenance, the MES records executionexpected January 2027
Shop Floor Data
Quality
Scrap with its reason from shop floor data goes into the scrap log and is analysed in Qualityfrom December 2026
Subcontracting
Warenwirtschaft (ERP)
An external operation on the production order becomes an outsourcing order with provided material and return deliveryfrom December 2026
Subcontracting
Quality
Incoming inspection of the return deliveryfrom December 2026
Warenwirtschaft (ERP)
Shipping
The delivery note becomes a shipment: lines, label, tracking, shipping e-mail
Warenwirtschaft (ERP)
Warehouse Logistics
The same articles, stock, batches and reservations, no second warehouse system
Warehouse Logistics
Core
Staging for production per shift from the same stock ledger
Shipping
Customs & Foreign Trade
Export process and documents, Customs builds on Shipping
Customs & Foreign Trade
Accounting
Exit confirmation as proof of the tax-exempt export
Warenwirtschaft (ERP)
Quality
Goods receipt requiring inspection: blocked stock and the task “inspect”; the release notifies the waiting order
Quality
Core
An open quality block stops the completion
Quality
Shipping
Blocked goods only leave the building with a special release
Traceability
Shipping
A blocked batch stops shipping automatically
Quality
Complaints
Complaint straight from the inspection record, linked to inspection and block
Complaints
Traceability
Determine what is affected from a batch or a single piece
Complaints
Warenwirtschaft (ERP)
Replacement delivery and credit note linked to delivery note and invoice
Complaints
Accounting
Disputed items in accounting
Warenwirtschaft (ERP)
Accounting
Invoices and supplier invoices post themselves when finalised; open items and payment runs
Accounting
Sales & CRM
Open items and credit limit in the sales view of the customer
Core
Time Recording
One employee record: time recording, absence, skills, piecework pay, shop floor data and planning read the same person
Time Recording
Core
Approved absence immediately affects capacity, planning board and staff suggestions; clocking in and out tells the automatic cover who is present
Shop Floor Data
Time Recording
Contradictions between attendance and shop floor bookings as a list to clear up
Piecework Pay
Time Recording
Piecework earnings go into the payroll hand-over at month end
Core
Piecework Pay
The same employee record, no second staff list for piecework
Core
HR
The same employee record, HR does not create a second personnel registerfrom December 2026
HR
Core
On the effective date POM switches badge, cover and planning; after an approved leaving date nothing is planned beyond the last working dayfrom December 2026
Time Recording
HR
Time accounts and leave account for staff planning and the calculation on leavingfrom December 2026
HR
Time Recording
Agreed time off in lieu is entered as an absence once the employee agreesfrom December 2026
Core
Analytics
Orders, dates and lead times
Warenwirtschaft (ERP)
Analytics
Documents, stock and deliveries
Shop Floor Data
Analytics
Feedback from production
Accounting
Analytics
Open items
Quality
Analytics
Inspections and blocks
Complaints
Analytics
Complaints
Time Recording
Analytics
Times, only as group figures, never per person
Integration
Warenwirtschaft (ERP)
EDI call-offs come in through Integration and are taken over in Warenwirtschaftfrom December 2026
Integration
Core
Writes orders, customers, articles and employees from other systems; feedback goes back
AI Interface (MCP)
Core
External AI programs read, draft and propose, never with more rights than the person; a person approves
Multi-Site
Core
Stock and ledgers per site; one order can run across two plants
Multi-Company
Analytics
Consolidated reporting across several companies
POM is ERP, CRM, production planning and shop floor data for manufacturers in one system: from quotation through planning, production, quality and shipping to accounting. One server in your building, one database, every workstation on the same state.
What POM covers
Roles and permissions define who may see and change what. Responsibilities define who has to act. The shop floor reports back at the terminal, work preparation plans, management evaluates, everyone sees the same state.
No renderings, no mockups: actual POM screens. All names and figures are sample data.
POM – Production Operations Management
Customer orders: 2,000 active orders in the test company, overdue ones in red. Sample data.
POM – Production Operations Management
“Situation” cockpit: what is late and what is about to slip. Sample data.
POM – Production Operations Management
Production floor: where each order sits, the view changes nothing. Sample data.
Actual POM screens, all names and figures are sample data.
Every role, its own tools
One system. For everyone in the company.
In POM everyone sees what belongs to their job, menu items only appear with a booked module and the matching permission. This is what the day looks like in the main roles.
Management
Sees the situation without asking around.
“Situation” cockpit: what is late, what is about to slip, how on-time delivery stands, calculated once on the server
Early warnings with a next action and a “Why?” for every change, without AI, never about individual people
Look into every process from enquiry to payment, with status and owner
As the named head, the last step of every escalation: no process is left without a next step
Roles in POM can be named and combined freely; the supplied roles are templates. Task names are examples from POM.
Included today
What POM brings across every module.
These functions are available. Anything that only comes from December 2026 or later is marked as such where it appears.
Templates for labels and documents, assigned per occasion. Sample data.
Document and label designer
Templates for documents and labels with versions, letterhead, custom fields and formula fields. Labels go to the label printer as ZPL, with barcodes such as Code 128, DataMatrix, QR and GS1.
E-invoicing
POM writes the XRechnung from the finalised invoice, reads it back and checks it, a file with errors does not leave the building. On request the invoice e-mail contains a ZUGFeRD PDF. Incoming invoices are read in via XRechnung import.
Accounting with DATEV
Your own financial accounting in POM or bookkeeping by your tax adviser: DATEV export with preview and a return path from the adviser. The firm gets a role that can only view and export.
Time recording and piecework pay
Clock in and out at the terminal, time accounts, leave requests with approval; piecework and homework with a monthly list per employee. POM prepares the figures and hands them to payroll, it does not run payroll itself.
Roles and permissions
Role templates, freely editable and renamable. One level switch per area, plus the permission simulation “What would POM look like for X?”. The server checks permission, module and company on every access.
System health
POM regularly checks disk, database, backup, access, licence, mail, printing and services. Every finding names the cause, the next step and who is responsible; a red finding becomes a task for administration.
Eleven languages, light and dark
Each user picks one of eleven languages; documents are printed in the recipient’s language. Light and dark themes, device modes for shop floor terminal and time clock. From December 2026 you also get F1 help for every screen and the “warehouse” device mode.
Companies and sites
The company is the security boundary: no company sees another one’s data. Sites organise plants with their own stock and calendars. The first company and the first site are free in the core.
Pilot operation
POM Intelligence
Local AI assistant, clearly marked: answers from your data with sources, drafts that a person approves. It never gets more permissions than the person it works for. POM runs fully without AI.
Every licence includes POM Core: orders, master data, planning with planning board and capacity, Today, tasks, messages, calendar, forms, workflows and administration. On top you add 22 modules in 8 groups, one by one, when you need them. Packages are discounts, never an obligation, the Basic package is the core plus ERP.
For the core and for each module you book as many concurrently signed-in users as you need. Each shop floor terminal counts as one user (core and BDE); workers book there with their badge and need no licence of their own. User accounts are unlimited. Modules are not installed but unlocked, no reinstallation. Modules you have not booked stay invisible, and a deselected module removes functions, never data.
POM MES Kabelkonfektionexpected January 2027First module of the MES family: machines with capabilities, production plans, control station with set-up optimisation, machine client and OEE. Customer pilots from Q1 2027.
POM MES Universalexpected early 2027The MES for any production without an industry-specific MES: records what really happens at the machines, states, messages, signals, control station and OEE. Planning stays in POM Machines & Maintenance.
POM Intelligencepilot operationLocal AI assistant: answers from your own data with sources, drafts for approval, no cloud. Marked as such until the legal review is complete.
Not yet available. MES Universal is expected in early 2027, MES for machining later, with no date set.
For the core and for each module you book as many concurrently signed-in users as you need. Each shop floor terminal counts as one user (core and BDE); workers book there with their badge and need no licence of their own. User accounts are unlimited. All prices net, plus statutory VAT. Every module in detail
Industries
Built for companies that manufacture to a deadline.
Wherever an order passes through several operations, quantities matter and the delivery date is not negotiable, POM helps. The industry is secondary, what counts is that you manufacture.
POM runs in-house. Your order data, customer lists and calculations sit on your server, not in a data centre you have never seen. For companies manufacturing for automotive or aerospace this is often a requirement.
Technically: the POM server runs as a Windows service with one database and holds all business logic. Workstations only talk to the server, database credentials never sit on a workstation. Terminal servers and shop floor PCs work too.
After the demo you can test POM in your own plant for 30 days, once per company, via a personal download link. First we show you POM online with a sample company.