DE EN
Request a demo

POM Quality

Inspection planning & quality

Inspection plans with characteristics and limits, unchangeable measured values, quality blocks and incoming inspection – proof is created as you inspect.

+79 € / month net with 1 user

Online demo first, then a 30-day trial

  1. 01

    The problem

    The QA step is ticked off. What was checked, with which gauge and with what result is on a sheet of paper – and blocked goods are recognised because someone happens to know.

  2. 02

    How POM solves it

    Inspection plans define per article and process step what to check – versioned from draft through active to superseded, at goods receipt too. Whether a measured value is in order is decided by the server against the limits. A quality block stops completion and dispatch. Inspecting, blocking and releasing are separate permissions.

  3. 03

    The result

    Every inspection is on record: who, when, with which gauge, with what result. In the audit, records are on the table instead of recollections.

Functions

What is inside.

  • Inspection plans with versions and characteristics – dimension, attribute, visual, function, document – with limits and sampling instruction

  • Assignment per article and process step, at goods receipt too

  • Inspection records cannot be changed; pass or fail is decided by the server, corrections only as a replacement record with a reason

  • Quality block with reason, quantity and type of release: fixed, special release or scrap

  • Incoming inspection: goods go to blocked stock automatically, release under the four-eyes principle; a supplier first article is recognised

  • Gauges: overdue calibration is noted permanently, the backward report answers “What was it measured with?”

  • Import test device files (CSV) instead of retyping; inspection report as print or CSV

  • Key figures: inspection rate, inspection scrap rate, first-article rejection rate

  • Without this module, POM asks QA for substitute evidence – an inspection never silently disappears

  • Roadmap

    From December 2026: scrap log with analysis by reason, scrap recorded at the terminal with POM Shop Floor Data

  • Roadmap

    No date yet: FMEA, control plan, audits, document control and SPC charts are being built

How it fits together

Every module feeds the next.

Receives

  • POM Machines & Maintenance Only calibrated gauges: an expired gauge is flagged as soon as work starts at the terminal
  • POM Shop Floor Data Scrap with its reason from shop floor data goes into the scrap log and is analysed in Quality from December 2026
  • POM Subcontracting Incoming inspection of the return delivery from December 2026
  • POM Warenwirtschaft (ERP) Goods receipt requiring inspection: blocked stock and the task “inspect”; the release notifies the waiting order

Passes on

  • POM Core An open quality block stops the completion
  • POM Shipping Blocked goods only leave the building with a special release
  • POM Complaints Complaint straight from the inspection record, linked to inspection and block
  • POM Analytics Inspections and blocks

All modules on the map

Price

Concurrent users count, not accounts.

Module, booked individually 10 % saving with annual billing

POM Quality with 1userwith 5userswith 10userswith 20userswith 50users more than 100users
net / month +79 €+363.40 €+679.40 €+1,232.40 €+2,654.40 € On request
net / month, annual billing +71.10 €+327.06 €+611.46 €+1,109.16 €+2,388.96 €

Example amounts with the same number of users, net plus statutory VAT. Per module you book as many concurrent users as you need, at most as many as in the core. User accounts are unlimited.

More than 100 concurrent users: individual quotation, price on request. Request a quote

Choose in the configurator

Quick answers

Questions about POM Quality

What is an inspection plan?

An inspection plan defines what to check on an article or in a process step: characteristics such as dimension, attribute, visual, function or document, with limits and a sampling instruction. In POM Quality, plans are versioned, draft, active, superseded, so earlier records stay valid. Whether a measured value is in order is decided by the server against the limits.

Can I correct a wrong measurement?

Yes, but not by overwriting it. Inspection records cannot be changed; a correction is a replacement record that needs a reason. In the audit it is clear what was measured originally and what was corrected later.

How does POM stop blocked goods?

With the quality block: it has a reason, a quantity and a type of release, and it stops completion and dispatch. At goods receipt, goods subject to inspection go to blocked stock automatically and are released under the four-eyes principle. Inspecting, blocking and releasing are separate permissions.

Are FMEA, control plan and audits included?

These parts are being built and are not part of the module today: FMEA, control plan, audits, document control and SPC charts. We do not name a date for them yet.

See POM for your business.

First we show you POM in an online demo with a sample company. After that you can test it for 30 days with a trial licence of your own.