POM Quality
Skills matrix & first articles
Maintain qualifications, release first articles only with documented proof, keep quality figures in view – the evidence stays on the order.
- 01
The problem
The first-article release is a tick in the system, the inspection report sits somewhere on a drive. When the customer asks for it in an audit, the search begins.
- 02
How POM solves it
Without a stored proof document POM does not release a first article, and series production stays blocked until the release. With POM Analytics, key figures show how often first articles are rejected. Inspection plans, measured values and blocks belong to POM Inspection, complaints to POM Complaints.
- 03
The result
The first-article proof is there when the customer asks – not once someone has found it.
Functions
What is inside.
-
First-article release only with a stored proof document
-
Series production blocked until the first article is released
-
Proof documents on the order, stored on the server and included in backups
-
One proof covers every part of a split order
-
Key figures with POM Analytics, such as the first-article rejection rate
-
Skills matrix: ability and difficulty levels per employee and work step – staff suggestions in planning build on it
Price
One number per tier – not per user.
Module – added individually 10 % saving with annual billing
| POM Quality | up to 5sessions | up to 10sessions | up to 20sessions | up to 50sessions | up to 100sessions | more than 100sessions |
|---|---|---|---|---|---|---|
| net / month | +14 € | +25 € | +45 € | +100 € | +175 € | On request |
| net / month, annual billing | +12.60 € | +22.50 € | +40.50 € | +90 € | +157.50 € |
All prices net, plus statutory VAT. Unlimited user accounts – concurrent sessions are what counts.
More than 100 concurrent sessions: individual quotation – price on request. Request a quote
Quick answers
Questions about POM Quality
What is a skills matrix?
A skills matrix records which employee masters which work step at which level. In POM Quality you maintain ability and difficulty levels per employee and work step. Qualifications can carry an instruction and an expiry date, and staff suggestions in planning build on the matrix. The employees come from the shared master data.
Do I need POM Quality for planning to take qualifications into account?
You need the skills matrix, and you maintain it with POM Quality or with POM Piecework – either module is enough. POM Planning from the base price then takes it into account automatically: staff suggestions rank who can actually do the work by qualification and workload. The first-article release with stored proof belongs to POM Quality.
How does a first-article release work with POM Quality?
The proof document is attached to the order, stored on the server and included in backups. Without this document POM does not release a first article, and series production stays blocked until the release. If an order is split, one proof covers every part of it. When a customer asks for the first-article proof in an audit, it is on the order instead of somewhere on a drive.
Do inspection plans and complaints belong to POM Quality?
No, they have modules of their own. POM Quality covers the skills matrix, the first-article release with proof and – together with POM Analytics – quality key figures. Inspection plans, measured values and blocks belong to POM Inspection, complaints with 8D reports to POM Complaints. You add each of them individually.
Quality
More modules in this category.
- Module
POM Complaints
Complaints with priority over everything else – captured, assigned, worked off, documented.
from +17 € / month, net Learn more - Module
POM Inspection
Inspection by plan: characteristics and tolerances, measured values on the order, blocking and scrap – the proof is created as you inspect.
from +28 € / month, net Learn more - Module
POM Traceability
Trace batches from goods receipt to delivery – forwards and backwards, with an affected-orders list and a material record.
from +41 € / month, net Learn more
POM in your industry
Where POM Quality matters most.
-
Cable assembly
The industry POM grew up in: hundreds of components, customer-specific variants, proof on every crimp.
Learn more -
Automotive suppliers
Delivery performance, call-offs and evidence – for customers who audit their suppliers.
Learn more -
Electrical engineering
High variant counts, test duties and a mix of series and specials.
Learn more -
Special vehicles
Project manufacturing with long build times and documentation the customer keeps for decades.
Learn more -
Aerospace-adjacent manufacturing
Evidence duties, qualifications and traceability expectations from the toughest customers.
Learn more
Try every module for 30 days.
During the trial the complete platform is unlocked – afterwards you choose what stays.